Robust optimization method for steelmaking-continuous casting scheduling with uncertain processing times

The following paper proposes a study about the existing solutions for dealing with uncertainty while solving the planning and scheduling problem at steel industry manufacturing processes. The different techniques designed to cope with uncertainty in manufacturing scheduling are discussed, along with the main uncertainty factors affecting the scheduling. The paper proposes a classification for the main uncertainties affecting the steelmaking process and analyzes the existing literature about solutions for the scheduling with uncertainty in the steel sector in terms of approaches followed and uncertainty types considered. Finally, the main remarks and future challenges within this field are presented.